[Press Release] Port road closures and poor accessibility will impede Scottish economy.

STENA SUPERFAST VII and STENA SUPERFAST VIII at the then brand-new Loch Ryan Port terminal, prior to their entry into service. Stena Line

Less than 16 days after the last closure, the A77 has once more been closed to all traffic for up to 12 hours, resulting in a 75-minute detour for traffic using Stena Line’s Loch Ryan Port. 

The most recent closure overnight on 6th November comes on the back of the 24-hr closure of the A77 following severe flooding on 21st October when the port was in virtual lockdown mode for over 24 hrs.   

error: Content is protected !!