Update 28/2/2014

I have added a profile for Stena Precision and Stena Performer (no pics yet)/  Still getting the hang of the macbook but have moved much of my draft material forward today.  I’m also still in the process of setting up my PC to boot into Mac OSX as well.

Additionally, there seems to be some problems with WordPress as the software keeps loosing its connection to the service.  Hopefully this is a temporary thing and not the start of an ongoing problem.

ULYSSES approaches the entrance to Belfast Dry Dock (BDD) on June 28th 2018. Copyright © Scott Mackey.

Ulysses goes to dry-dock, but W.B. Yeats is still not in service

Read More »
Painting underway on Stena's first E-Flexer, W0263, at AVIC Weihai. Note the snow in the foreground! AVIC Weihai

Stena E-Flexer update – First New Stena Ferry to be “launched” tomorrow Morning

Tomorrow is an important milestone in the E-Flexer project, with the first vessel due to be floated out at AVIC Weihai tomorrow morning. Stena Line has announced that they will be broadcasting the “launch” live from China via their LinkedIn page

Read More »
'Ferrycards' postcard of STENA GALLOWAY leaving Belfast in Stena Line colours. Copyright © Gordon Hislip

LE RIF Looks Like She Could Have Found a New Operator – but it’s NOT Seaborne Freight!

Reports from the Mediterranean suggest that veteran ferry LE RIF, which as reported by NIFS went into dry-dock last week, has indeed found a new operator.

Read More »

NI Ferry Site E-Mail alert serviceNever want to miss a post from NI Ferry Site?  Our FREE email subscription service will send you an email the moment there is a new post on the site.  All you need to do is submit your email address at the link below, and we’ll add you to the list!

Subscribe to NI Ferry Site

error: Content is protected !!